SDG&E EV charger rebates for businesses (2026)
SDG&E's Power Your Drive programs for apartments, condos and workplaces are closed (SDG&E: "The program is fully subscribed. We are no longer accepting applications."), which is why San Diego multifamily owners see fewer options than Bay Area owners. Two things are open for business sites now: Power Your Drive for Fleets for medium- and heavy-duty fleets, and the County of San Diego Public EV Charger Incentive Pilot for publicly accessible chargers in unincorporated areas, which closes October 23, 2026.
Power Your Drive for Fleets (open)
SDG&E's page shows no closing date. To qualify, a fleet must commit to at least 2 electric fleet vehicles, show a long-term electrification plan and load schedule, report charger data for at least 5 years, and own or lease the site in SDG&E territory and operate the vehicles and chargers for at least 10 years. It covers Class 2 to 8 vehicles such as trucks, buses, airport equipment and forklifts.
- Option 1: SDG&E funds and maintains the infrastructure up to the charging station; you own the chargers.
- Option 2: SDG&E funds to the meter; you own the customer-side infrastructure and get a rebate of up to 80% of its cost.
- Charger rebate for transit agencies, school districts and fleets in disadvantaged communities: up to 50% of charger cost, capped from $3,000 per charger (up to 19.2 kW) to $75,000 per charger (above 150 kW).
SDG&E lists the steps as: interest form, eligibility check by an SDG&E representative, formal application, then design and engineering (6 to 9 months) and construction (3 to 4 months) before activation.
County of San Diego Public EV Charger Incentive Pilot (open until October 23, 2026)
For publicly accessible chargers on private property in unincorporated San Diego County only. The city of San Diego, Chula Vista, Oceanside and the other incorporated cities are not eligible, and neither are federal, state, tribal or single-family sites. Round 1 runs June 25 to October 23, 2026. The county pays the lesser of a fixed cap or 75% of cost: up to $5,000 per Level 2 charger, $50,000 per 50 to 99 kW DC fast charger, and $75,000 per DC fast charger of 100 kW or more. Per-site caps are $30,000 for Level 2 ($36,000 in Equity Priority Areas) and $225,000 for DC fast charging ($255,000 in Equity Priority Areas).
What is not available
- Power Your Drive for apartments, condos and workplaces: closed to new projects.
- San Diego APCD Carl Moyer infrastructure: the district page still reads "currently open until May 15, 2026 at 5PM", a date that has passed. Treat it as between rounds until the district posts a new cycle.
- City of San Diego: no direct charger rebate.
Open now in SDG&E territory
Programs accepting applications that serve commercial, multifamily or fleet sites here. Amounts and dates come from our database; follow each link for the agency's current terms.
| Program | Level | Status | Amount (from our data) | Verified |
|---|---|---|---|---|
| SDG&E Power Your Drive (Fleets) Open; submit an interest form to SDG&E (no published deadline). | Utility | Open | See program | 2026-09-29 |
| Public Electric Vehicle Charger Incentive Pilot Program (agency site) Round 1 application window June 25, 2026 to October 23, 2026. Applications due October 23, 2026. Selected projects have 270 days (L2) or 450 days (DCFC) to complete. | County | Open | up to $5,000 per L2 port, up to $75,000 per DCFC port | 2026-09-29 |
| City of San Diego - No Direct City Cash Rebate (agency site) N/A | City | Open | See program | 2026-09-25 |
| LCFS Electricity Pathway Continuous program. Annual registration with CARB. | California State | Open | See program | 2026-09-29 |
| Carl Moyer Program Per local air district. SCAQMD, BAAQMD, SJVAPCD typically open Q1 windows. Annual cycle. | California State | Open | See program | 2026-09-25 |
| Section 48E Storage ITC Energy storage technology placed in service after Dec. 31, 2024 remains eligible under Section 48E. For facilities beginning construction after Dec. 31, 2025, prohibited foreign entity (material assistance) restrictions apply per IRS guidance. Wind and solar phase-out accelerated under OBBBA; storage less affected. | Federal | Open | See program | 2026-09-29 |
Between rounds or waiting on a new window
Worth tracking. These have funded projects here before and have no open window today.
| Program | Level | Status | Amount (from our data) | Verified |
|---|---|---|---|---|
| SDAPCD Carl Moyer Infrastructure Clean Air for All (Carl Moyer) application window closed May 15, 2026 at 5pm. Next cycle not yet announced. | Regional | Between rounds | See program | 2026-09-29 |
| NEVI Formula Program CEC NEVI Solicitation 6, Community Charging (GFO-25-603): released February 23, 2026; applications due October 16, 2026 at 11:59 pm through the CEC ECAMS portal. Up to $79,000,000 in grant funds. NEVI 4 (GFO-25-604, due May 28, 2026) and NEVI 5 (GFO-25-606, due June 18, 2026) are closed. The Solicitation 6 deadline (October 16, 2026) has passed. | Federal | Between rounds | See program | 2026-09-29 |
| CALeVIP Communities in Charge Wave 4 opened August 5, 2025 and is closed (CEC's solicitation page lists February 27, 2026; a CEC docket document lists January 9, 2026). The program site says Funding Wave 5 is coming soon; no dates or budget published yet. Join the mailing list at thecommunitiesincharge.org. | California State | Between rounds | See program | 2026-09-29 |
| HCD AHSC Round 10 NOFA released March 4, 2026; applications closed May 4, 2026 at 4:00 pm. SGC lists Round 10 awards for adoption at its December 16, 2026 Council meeting. Round 11 timing not announced. | California State | Between rounds | See program | 2026-09-29 |
| CFI Community Grant Round 3 NOFO not yet announced as of May 2026. FHWA has not provided estimated date. Monitor grants.gov and fhwa.dot.gov/environment/cfi/. | Federal | Between rounds | See program | 2026-09-29 |
| CFI Corridor Grant Round 3 NOFO not yet announced as of May 2026. | Federal | Between rounds | See program | 2026-09-29 |
| EnergIIZE Fast Track 2025 Fast Track window ran May 13 to July 15, 2025 and is now closed. EnergIIZE lists all lanes as closed (latest, the MCS lane, closed Feb. 26, 2026). No future window announced. | California State | Between rounds | up to $5,000,000 per site | 2026-09-25 |
Getting it built in SDG&E territory
Power Your Drive for Fleets is a utility-led build: SDG&E designs and builds the infrastructure under Option 1, or funds to the meter under Option 2 while your contractor builds the rest. For the county pilot, you install and the county reimburses after completion within the program deadlines.
Who files the rebate applications is usually the site owner, or the installer or charging provider on the owner's behalf. Some providers offer turnkey projects (design, permits, install and paperwork for one price) or revenue-share and charging-as-a-service deals where they fund part of the equipment and share charging revenue. Both can work; compare the contract length, who keeps the rebates and LCFS credits, and what happens at the end of the term. More detail on the San Diego County page.
Where EVgpo fits: EVgpo sources chargers at group pricing and sells nationwide. You can ask us for a charger quote and compare it with your installer's.
Official SDG&E page
SDG&E Power Your Drive for Fleets
Related guides
Regions: San Diego County
Sources
Checked on 2026-09-29. Confirm status and amounts with each agency before you apply.
- SDG&E Power Your Drive for Fleets
- SDG&E Power Your Drive for Apartments and Condos (closed)
- SDG&E Power Your Drive for Workplaces (closed)
- County of San Diego Public EV Charger Incentive Pilot
- San Diego APCD Carl Moyer