Updated monthly

← All utility guides · Find programs by ZIP

SDG&E EV charger rebates for businesses (2026)

SDG&E's Power Your Drive programs for apartments, condos and workplaces are closed (SDG&E: "The program is fully subscribed. We are no longer accepting applications."), which is why San Diego multifamily owners see fewer options than Bay Area owners. Two things are open for business sites now: Power Your Drive for Fleets for medium- and heavy-duty fleets, and the County of San Diego Public EV Charger Incentive Pilot for publicly accessible chargers in unincorporated areas, which closes October 23, 2026.

Power Your Drive for Fleets (open)

SDG&E's page shows no closing date. To qualify, a fleet must commit to at least 2 electric fleet vehicles, show a long-term electrification plan and load schedule, report charger data for at least 5 years, and own or lease the site in SDG&E territory and operate the vehicles and chargers for at least 10 years. It covers Class 2 to 8 vehicles such as trucks, buses, airport equipment and forklifts.

SDG&E lists the steps as: interest form, eligibility check by an SDG&E representative, formal application, then design and engineering (6 to 9 months) and construction (3 to 4 months) before activation.

County of San Diego Public EV Charger Incentive Pilot (open until October 23, 2026)

For publicly accessible chargers on private property in unincorporated San Diego County only. The city of San Diego, Chula Vista, Oceanside and the other incorporated cities are not eligible, and neither are federal, state, tribal or single-family sites. Round 1 runs June 25 to October 23, 2026. The county pays the lesser of a fixed cap or 75% of cost: up to $5,000 per Level 2 charger, $50,000 per 50 to 99 kW DC fast charger, and $75,000 per DC fast charger of 100 kW or more. Per-site caps are $30,000 for Level 2 ($36,000 in Equity Priority Areas) and $225,000 for DC fast charging ($255,000 in Equity Priority Areas).

What is not available

Check every program for your site in SDG&E territory

Open now in SDG&E territory

Programs accepting applications that serve commercial, multifamily or fleet sites here. Amounts and dates come from our database; follow each link for the agency's current terms.

ProgramLevelStatusAmount (from our data)Verified
SDG&E Power Your Drive (Fleets)
Open; submit an interest form to SDG&E (no published deadline).
UtilityOpenSee program2026-09-29
Public Electric Vehicle Charger Incentive Pilot Program (agency site)
Round 1 application window June 25, 2026 to October 23, 2026. Applications due October 23, 2026. Selected projects have 270 days (L2) or 450 days (DCFC) to complete.
CountyOpenup to $5,000 per L2 port, up to $75,000 per DCFC port2026-09-29
City of San Diego - No Direct City Cash Rebate (agency site)
N/A
CityOpenSee program2026-09-25
LCFS Electricity Pathway
Continuous program. Annual registration with CARB.
California StateOpenSee program2026-09-29
Carl Moyer Program
Per local air district. SCAQMD, BAAQMD, SJVAPCD typically open Q1 windows. Annual cycle.
California StateOpenSee program2026-09-25
Section 48E Storage ITC
Energy storage technology placed in service after Dec. 31, 2024 remains eligible under Section 48E. For facilities beginning construction after Dec. 31, 2025, prohibited foreign entity (material assistance) restrictions apply per IRS guidance. Wind and solar phase-out accelerated under OBBBA; storage less affected.
FederalOpenSee program2026-09-29

Between rounds or waiting on a new window

Worth tracking. These have funded projects here before and have no open window today.

ProgramLevelStatusAmount (from our data)Verified
SDAPCD Carl Moyer Infrastructure
Clean Air for All (Carl Moyer) application window closed May 15, 2026 at 5pm. Next cycle not yet announced.
RegionalBetween roundsSee program2026-09-29
NEVI Formula Program
CEC NEVI Solicitation 6, Community Charging (GFO-25-603): released February 23, 2026; applications due October 16, 2026 at 11:59 pm through the CEC ECAMS portal. Up to $79,000,000 in grant funds. NEVI 4 (GFO-25-604, due May 28, 2026) and NEVI 5 (GFO-25-606, due June 18, 2026) are closed. The Solicitation 6 deadline (October 16, 2026) has passed.
FederalBetween roundsSee program2026-09-29
CALeVIP Communities in Charge
Wave 4 opened August 5, 2025 and is closed (CEC's solicitation page lists February 27, 2026; a CEC docket document lists January 9, 2026). The program site says Funding Wave 5 is coming soon; no dates or budget published yet. Join the mailing list at thecommunitiesincharge.org.
California StateBetween roundsSee program2026-09-29
HCD AHSC
Round 10 NOFA released March 4, 2026; applications closed May 4, 2026 at 4:00 pm. SGC lists Round 10 awards for adoption at its December 16, 2026 Council meeting. Round 11 timing not announced.
California StateBetween roundsSee program2026-09-29
CFI Community Grant
Round 3 NOFO not yet announced as of May 2026. FHWA has not provided estimated date. Monitor grants.gov and fhwa.dot.gov/environment/cfi/.
FederalBetween roundsSee program2026-09-29
CFI Corridor Grant
Round 3 NOFO not yet announced as of May 2026.
FederalBetween roundsSee program2026-09-29
EnergIIZE Fast Track
2025 Fast Track window ran May 13 to July 15, 2025 and is now closed. EnergIIZE lists all lanes as closed (latest, the MCS lane, closed Feb. 26, 2026). No future window announced.
California StateBetween roundsup to $5,000,000 per site2026-09-25

Getting it built in SDG&E territory

Power Your Drive for Fleets is a utility-led build: SDG&E designs and builds the infrastructure under Option 1, or funds to the meter under Option 2 while your contractor builds the rest. For the county pilot, you install and the county reimburses after completion within the program deadlines.

Who files the rebate applications is usually the site owner, or the installer or charging provider on the owner's behalf. Some providers offer turnkey projects (design, permits, install and paperwork for one price) or revenue-share and charging-as-a-service deals where they fund part of the equipment and share charging revenue. Both can work; compare the contract length, who keeps the rebates and LCFS credits, and what happens at the end of the term. More detail on the San Diego County page.

Where EVgpo fits: EVgpo sources chargers at group pricing and sells nationwide. You can ask us for a charger quote and compare it with your installer's.

Official SDG&E page

SDG&E Power Your Drive for Fleets

Related guides

Regions: San Diego County

Sources

Checked on 2026-09-29. Confirm status and amounts with each agency before you apply.