SCE EV charger rebates for businesses (2026)
Every lane of SCE's Charge Ready program is closed. SCE's page says: "Charge Ready applications are no longer being accepted." Projects that already hold an agreement must have it fully signed by December 31, 2026. If you are planning a new commercial, multifamily or fleet charging project in SCE territory, the funding now comes from the state, your air district, your city utility or community choice aggregator (CCA), and a new SCE rebate aimed at large shared fleet sites.
What closed, and when
- Charge Ready Charging Infrastructure & Rebate: SCE built the utility-side and customer-side make-ready or paid a rebate toward customer-built infrastructure (up to 80% of SCE's estimated costs, 4 or more ports). Closed.
- Charge Ready New Construction Rebate: up to $3,500 per Level 2 port above CALGreen minimums at new multifamily buildings. SCE says the application window closed on July 12, 2025.
- Charge Ready Small Site and Charge Ready Transport (medium- and heavy-duty fleets): closed to new applications. Transport agreements must be signed by December 31, 2026 at 11:59 pm.
- Southern California Level 2 CALeVIP project (funded in part by Clean Power Alliance): closed as part of the CALeVIP 1.0 shutdown.
What replaced it
Nothing replaces Charge Ready one for one. Three things fill part of the gap:
- SCE Shared Fleet Charging Rebate (SFCR). SCE's program handbook (dated December 11, 2025) describes a dollars-per-installed-kW rebate for medium- and heavy-duty sites that serve several fleets or the public, at 1 MW or more (or 150 kW per on-route wireless charging location). You must already be working with SCE on a Rule 15, 16 or 29 service project, and applications are first come, first served. The handbook does not publish the $/kW figure or dates: ask SCE at SharedFleetCharging@sce.com.
- SCE Transportation Electrification Advisory Services. Free EV readiness studies and guidance, linked from SCE's Charge Ready page. It does not pay for equipment.
- State and regional money. CEC's NEVI Solicitation 6 for public DC fast charging took applications until October 16, 2026. Communities in Charge (Level 2, mostly multifamily) has Funding Wave 5 "coming soon" with no date. Air districts inside SCE territory run their own programs, listed below.
Check who your electric utility really is
SCE covers most of Southern California outside the City of Los Angeles, but several cities inside its footprint have their own municipal utilities with their own charger rebates: Burbank, Glendale, Pasadena, Anaheim, Riverside, Vernon, Azusa and Colton among them. If your meter is billed by one of those, SCE programs never applied and the city utility is your first stop. Enter the site ZIP in the finder and it sorts this out for you.
Open now in SCE territory
Programs accepting applications that serve commercial, multifamily or fleet sites here. Amounts and dates come from our database; follow each link for the agency's current terms.
| Program | Level | Status | Amount (from our data) | Verified |
|---|---|---|---|---|
| Electric Vehicle Charging Station Program (agency site) Rolling - verify open status with AVAQMD. | Regional | Open | See program | 2026-09-25 |
| Ventura County Clean Air Infrastructure Grant / South Central Coast Incentive Project (agency site) 126 Corridor EV Chargers grant is open; no application deadline stated. The South Central Coast CALeVIP project is closed to new applications. | Regional | Open | See program | 2026-09-25 |
| Charge Up SB (Santa Barbara Clean Energy multifamily EV charging) (agency site) Ongoing; reserve incentive before installation (no published deadline). | Utility | Open | up to $5,500 per L2 port | 2026-09-29 |
| 3CE Electrify Your Ride (Commercial) Purchases and installations made August 1, 2026 to September 30, 2027 must be submitted by September 30, 2027. First come, first served, subject to available funding. | Utility | Open | See program | 2026-10-05 |
| SJVAPCD Charge Up! Open year-round; first-come first-served until annual funds depleted. | Regional | Open | up to $5,000 per L2 port, up to $25,000 per DCFC port | 2026-09-29 |
| Charge Up! (administered by SJVAPCD; covers Tulare County) (agency site) See sjvapcd_charge_up. | Regional | Open | up to $5,000 per L2 port, up to $25,000 per DCFC port | 2026-09-25 |
| OCPA Incentive Finder + EV Charge programs (agency site) Verify per program | Utility | Open | See program | 2026-09-25 |
| LCFS Electricity Pathway Continuous program. Annual registration with CARB. | California State | Open | See program | 2026-09-29 |
| Carl Moyer Program Per local air district. SCAQMD, BAAQMD, SJVAPCD typically open Q1 windows. Annual cycle. | California State | Open | See program | 2026-09-25 |
| Section 48E Storage ITC Energy storage technology placed in service after Dec. 31, 2024 remains eligible under Section 48E. For facilities beginning construction after Dec. 31, 2025, prohibited foreign entity (material assistance) restrictions apply per IRS guidance. Wind and solar phase-out accelerated under OBBBA; storage less affected. | Federal | Open | See program | 2026-09-29 |
Between rounds or waiting on a new window
Worth tracking. These have funded projects here before and have no open window today.
| Program | Level | Status | Amount (from our data) | Verified |
|---|---|---|---|---|
| SCAQMD Carl Moyer Infrastructure 2025 Carl Moyer application period closed July 15, 2025. No 2026 solicitation posted on the SCAQMD Carl Moyer page as of Sep 2026. | Regional | Between rounds | See program | 2026-09-29 |
| Zero-Emission Infrastructure Program (agency site) Currently closed; MDAQMD says the program will reopen in 2027. Contact grants@mdaqmd.ca.gov or 760.245.1661 ext. 3004. | Regional | Between rounds | See program | 2026-09-25 |
| Clean Air Grants for Infrastructure (EV Charging) (agency site) Most recent solicitation closed Sep 5, 2025. District lists a 2026 Clean Air Grants for Infrastructure solicitation as upcoming, dates not yet posted. Subscribe to the Grants email list at ourair.org. | Regional | Between rounds | up to $250,000 per site | 2026-09-25 |
| NEVI Formula Program CEC NEVI Solicitation 6, Community Charging (GFO-25-603): released February 23, 2026; applications due October 16, 2026 at 11:59 pm through the CEC ECAMS portal. Up to $79,000,000 in grant funds. NEVI 4 (GFO-25-604, due May 28, 2026) and NEVI 5 (GFO-25-606, due June 18, 2026) are closed. The Solicitation 6 deadline (October 16, 2026) has passed. | Federal | Between rounds | See program | 2026-09-29 |
| CALeVIP Communities in Charge Wave 4 opened August 5, 2025 and is closed (CEC's solicitation page lists February 27, 2026; a CEC docket document lists January 9, 2026). The program site says Funding Wave 5 is coming soon; no dates or budget published yet. Join the mailing list at thecommunitiesincharge.org. | California State | Between rounds | See program | 2026-09-29 |
| HCD AHSC Round 10 NOFA released March 4, 2026; applications closed May 4, 2026 at 4:00 pm. SGC lists Round 10 awards for adoption at its December 16, 2026 Council meeting. Round 11 timing not announced. | California State | Between rounds | See program | 2026-09-29 |
| CFI Community Grant Round 3 NOFO not yet announced as of May 2026. FHWA has not provided estimated date. Monitor grants.gov and fhwa.dot.gov/environment/cfi/. | Federal | Between rounds | See program | 2026-09-29 |
| CFI Corridor Grant Round 3 NOFO not yet announced as of May 2026. | Federal | Between rounds | See program | 2026-09-29 |
| EnergIIZE Fast Track 2025 Fast Track window ran May 13 to July 15, 2025 and is now closed. EnergIIZE lists all lanes as closed (latest, the MCS lane, closed Feb. 26, 2026). No future window announced. | California State | Between rounds | up to $5,000,000 per site | 2026-09-25 |
Closed recently
Kept here so you know what no longer applies. Each program page explains what happened.
| Program | Level | Status | Amount (from our data) | Verified |
|---|---|---|---|---|
| SCE Charge Ready (Infrastructure) | Utility | Closed | See program | 2026-09-29 |
| SCE Charge Ready (New Construction) | Utility | Closed | up to $3,500 per L2 port | 2026-09-29 |
| SCE Charge Ready (Small Site) | Utility | Closed | See program | 2026-09-29 |
| SCE Charge Ready Transport | Utility | Closed | See program | 2026-09-29 |
| CPA SmartCharge CALeVIP (SoCal L2) | Utility | Closed | up to $6,000 per L2 port | 2026-09-25 |
| SCAQMD SoCal EV Ready | Regional | Closed | up to $2,500 per L2 port | 2026-09-25 |
Getting it built in SCE territory
With Charge Ready gone, SCE is no longer designing or building the customer-side wiring for you. Budget for your own electrical contractor, and talk to SCE early about the service upgrade, because the utility side still sets the schedule.
Who files the rebate applications is usually the site owner, or the installer or charging provider on the owner's behalf. Some providers offer turnkey projects (design, permits, install and paperwork for one price) or revenue-share and charging-as-a-service deals where they fund part of the equipment and share charging revenue. Both can work; compare the contract length, who keeps the rebates and LCFS credits, and what happens at the end of the term. More detail on the Los Angeles County page.
Where EVgpo fits: EVgpo sources chargers at group pricing and sells nationwide. You can ask us for a charger quote and compare it with your installer's.
Official SCE page
Related guides
Regions: Los Angeles County
Sources
Checked on 2026-09-29. Confirm status and amounts with each agency before you apply.
- SCE Charge Ready (status and deadline)
- SCE Charge Ready New Construction Rebate
- SCE Charge Ready Transport
- SCE Shared Fleet Charging Rebate handbook (Dec 11, 2025)
- CEC NEVI Solicitation 6 (GFO-25-603)
- Communities in Charge
Pricing chargers for a project in SCE territory?
EVgpo sources ChargePoint, Blink, Siemens, ABB and Wallbox chargers at group pricing. Send your plan set or product list and we'll quote it.
Get charger pricing →