← Back to the rebate database · All programs
EV Fleet Program
Utility make-ready plus charger rebate for medium and heavy-duty fleets. Fully subscribed and closed to new applications; PG&E EV Advisory Services still available free.
At a glance
| Status | Closed to new applications |
|---|---|
| Eligible sites | fleet, public access, school or government, workplace |
| Timing | Closed. PG&E states the EV Fleet program is fully subscribed and no longer accepting applications (no waitlist listed). |
| Administered by | Pacific Gas and Electric Company (PG&E) |
| Last verified | 2026-09-29 |
Status and key dates
Closed Checked against the agency page on 2026-09-29
Closed. PG&E says EV Fleet is "fully subscribed and is no longer accepting applications." No waitlist is listed.
- New applications
- Closed (fully subscribed)
What to use instead
PG&E points fleets to its free EV Advisory Services. EV Power Ready (Rule 29) can cover utility-side construction for new, separately metered charging. Full list: PG&E utility guide.
Open or upcoming programs that cover similar projects. Status and amounts are live from our database.
| Program | Level | Status | Amount (from our data) | Verified |
|---|---|---|---|---|
| SJVAPCD Charge Up! | Regional | Open | up to $5,000 per L2 port, up to $25,000 per DCFC port | 2026-09-29 |
| Carl Moyer Program | California State | Open | See program | 2026-09-25 |
| EnergIIZE Fast Track | California State | Between rounds | up to $5,000,000 per site | 2026-09-25 |
| LCFS Electricity Pathway | California State | Open | See program | 2026-09-29 |
| NEVI Formula Program | Federal | Between rounds | See program | 2026-09-29 |
How it pays
PG&E pays for and installs make-ready electrical infrastructure to the customer-side stub at zero cost. Optional charger rebate $15K-$42K per charger depending on power output, with bonus uplifts for DAC/AB1550 sites and disadvantaged-community fleets. Transit, school bus, and DAC fleets receive enhanced support. ~$236M program; targeting 700 sites/6,500 vehicles.
DAC bonus available. Projects in state-designated low-income or environmental-justice areas qualify for a higher rebate amount on this program.
Who qualifies
Class 2-8 medium- and heavy-duty vehicles. Transit agencies, school districts, ports, airports were prioritized. PG&E says the program is fully subscribed and no longer accepting applications; no waitlist is listed. PG&E EV Advisory Services remains available.
Eligible properties
Geography
PG&E electric service territory.
Timing
Closed. PG&E states the EV Fleet program is fully subscribed and no longer accepting applications (no waitlist listed).
How to apply
How this stacks with other programs
Utility programs typically stack with utility, regional (air district), state, and city/county programs on the same project. The general California stacking rules:
- Federal §30C tax credit: ended for chargers placed in service after June 30, 2026. Projects placed in service on or before that date may still claim it; new projects should plan without it.
- Federal grants (CFI, REAP, NEVI): not stackable with other federal grants on the same port.
- State + utility + regional + local: generally full stack across tiers. Same-tier programs serving the same port don't double-fund.
For the full stacking matrix, see the homepage stacking section.
More utility programs
- EV Charge 2 - Multifamily Housing & Small Business EV Charger Program (MSEVCP)
Pacific Gas and Electric Company (PG&E) - Empower EV Program
Pacific Gas and Electric Company (PG&E) - Business EV (BEV/BEV4ALL) Commercial Rate
Pacific Gas and Electric Company (PG&E) - Charge Ready - Charging Infrastructure & Rebate Program
Southern California Edison (SCE) - Charge Ready - New Construction Rebate (NCR)
Southern California Edison (SCE)
Utility guide
This program is part of the PG&E picture. See everything open there:
Sources checked on 2026-09-29
Sourcing chargers for a project that uses this program?
EVgpo quotes the chargers for projects that use this program: ChargePoint, Blink, Siemens, ABB, Wallbox and most other commercial brands. The program is filled in for you.
Get charger pricing →Verified against agency sources on 2026-09-29. Eligibility, deadlines, and dollar amounts can change between refresh cycles - always confirm directly with Pacific Gas and Electric Company (PG&E) before applying. See how we verify.