Charge Up LA! - Commercial EV Charger Rebate Program
LADWP commercial rebate for chargers at commercial, industrial and multifamily common-area sites in the City of Los Angeles. Open enrollment has ended; FY2026-27 funds ($45M L2, $20M DCFC) are pending release.
At a glance
| Status | Between rounds: next round not yet open |
|---|---|
| Eligible sites | affordable housing, fleet, multifamily, public access, workplace |
| Timing | Open enrollment has ended; LADWP dashboard (updated Aug 19, 2026) shows FY2026-27 funds pending release ($45M L2, $20M DCFC). Check dashboard for next enrollment. |
| Administered by | Los Angeles Department of Water and Power (LADWP) |
| Last verified | 2026-09-29 |
Status and key dates
Between rounds Checked against the agency page on 2026-09-29
Between rounds. LADWP: "The open enrollment period for the Commercial Electric Vehicle Charger Rebate program has officially ended." The dashboard (updated August 19, 2026) lists FY2026-27 funds pending release: $45,000,000 for Level 2 and $20,000,000 for DC fast charging.
- Last enrollment
- Ended
- FY2026-27 funds
- Pending release (dashboard, August 19, 2026)
Who qualifies
LADWP customers at commercial, industrial and common areas of multifamily locations, including homeowners associations.
How EV charging fits this program
A direct rebate on charger projects inside the City of Los Angeles.
Amounts
Based on itemized, eligible project costs minus other incentives. Up to 80 Level 2 chargers per premises; 20 DC fast chargers if public (2 if restricted); medium- and heavy-duty up to $2,000,000 per site. Per-charger caps for the next enrollment are not posted: check with LADWP.
How to apply, step by step
- Watch the LADWP dashboard for the FY2026-27 release.
- When it opens, apply before you build (Rebate Reservation), or after (Post Deployment Rebate, with prior engineering approval and final permits).
- Expect a lottery if applications exceed funds.
What to use instead
While LADWP is between enrollments, the full list for City of LA sites is in our LADWP utility guide.
Open or upcoming programs that cover similar projects. Status and amounts are live from our database.
| Program | Level | Status | Amount (from our data) | Verified |
|---|---|---|---|---|
| NEVI Formula Program | Federal | Between rounds | See program | 2026-09-29 |
| CALeVIP Communities in Charge | California State | Between rounds | See program | 2026-09-29 |
| SCAQMD Carl Moyer Infrastructure | Regional | Between rounds | See program | 2026-09-29 |
| LCFS Electricity Pathway | California State | Open | See program | 2026-09-29 |
| LA Express Permit for EV Chargers (LADBS + LADWP) (agency site) | City | Open | See program | 2026-09-25 |
How it pays
LADWP's FAQ says the final rebate is based on itemized, eligible project costs minus other third-party incentives. Limits: up to 80 Level 2 chargers per premises; up to 20 DCFC per premises if public access (2 if restricted); medium- and heavy-duty chargers up to $2,000,000 per site. Per-charger caps for the FY2026-27 enrollment are not posted yet: check with LADWP.
DAC bonus available. Projects in state-designated low-income or environmental-justice areas qualify for a higher rebate amount on this program.
Who qualifies
LADWP customers at commercial, industrial and common areas of multifamily locations (including HOAs). Chargers must be new. Apply before deployment (Rebate Reservation) or after deployment (Post Deployment Rebate, needs prior engineering approval and final permits). LADWP uses a lottery when applications exceed funding.
Eligible properties
Geography
City of Los Angeles (LADWP service territory).
Timing
Open enrollment has ended; LADWP dashboard (updated Aug 19, 2026) shows FY2026-27 funds pending release ($45M L2, $20M DCFC). Check dashboard for next enrollment.
How to apply
How this stacks with other programs
Utility programs typically stack with utility, regional (air district), state, and city/county programs on the same project. The general California stacking rules:
- Federal §30C tax credit: ended for chargers placed in service after June 30, 2026. Projects placed in service on or before that date may still claim it; new projects should plan without it.
- Federal grants (CFI, REAP, NEVI): not stackable with other federal grants on the same port.
- State + utility + regional + local: generally full stack across tiers. Same-tier programs serving the same port don't double-fund.
For the full stacking matrix, see the homepage stacking section.
More utility programs
- EV Charge 2 - Multifamily Housing & Small Business EV Charger Program (MSEVCP)
Pacific Gas and Electric Company (PG&E) - Empower EV Program
Pacific Gas and Electric Company (PG&E) - EV Fleet Program
Pacific Gas and Electric Company (PG&E) - Business EV (BEV/BEV4ALL) Commercial Rate
Pacific Gas and Electric Company (PG&E) - Charge Ready - Charging Infrastructure & Rebate Program
Southern California Edison (SCE)
Utility guide
This program is part of the LADWP picture. See everything open there:
Sources checked on 2026-09-29
Sourcing chargers for a project that uses this program?
EVgpo quotes the chargers for projects that use this program: ChargePoint, Blink, Siemens, ABB, Wallbox and most other commercial brands. The program is filled in for you.
Get charger pricing →Verified against agency sources on 2026-09-29. Eligibility, deadlines, and dollar amounts can change between refresh cycles - always confirm directly with Los Angeles Department of Water and Power (LADWP) before applying. See how we verify.