Electric Vehicle Charging Infrastructure Resiliency Program (PON2026-01)
Air district competitive grant for fleet and multifamily. SCAQMD jurisdiction.
How it pays
PON2026-01 — competitive grant for EV charging infrastructure with resiliency (solar+storage) features. Specific per-port caps in PON document.
Who qualifies
Newer 2026 PON — pairs EV charging with solar/storage for grid resiliency. Verify PON status.
Eligible properties
Geography
SCAQMD jurisdiction.
Timing
Per PON2026-01 schedule.
How to apply
How this stacks with other programs
Regional programs typically stack with utility, regional (air district), state, and city/county programs on the same project. The general California stacking rules:
- Federal §30C tax credit: stacks with state, utility, regional, and local cash rebates without offset. Stacks with federal grants only with basis offset (federal grant amount reduces §30C basis).
- Federal grants (CFI, REAP, NEVI): not stackable with other federal grants on the same port.
- State + utility + regional + local: generally full stack across tiers. Same-tier programs serving the same port don't double-fund.
For the full stacking matrix, see the homepage stacking section.
More regional programs
- Charge! Program
Bay Area Air Quality Management District (BAAQMD) - Residential EV Charging Incentive Program (MSRC)
South Coast Air Quality Management District (SCAQMD) / MSRC - Carl Moyer Program — EV Charging Infrastructure (Fleet)
South Coast Air Quality Management District (SCAQMD) - SoCal EV Ready Program
South Coast Air Quality Management District (SCAQMD) - Charge Up! EV Charger Incentive Program
San Joaquin Valley Air Pollution Control District (SJVAPCD)
Sourcing chargers for a project that uses this program?
EVgpo members stack programs like this one with cooperative pricing on the chargers themselves — 20–40% below MSRP. ChargePoint, Blink, Siemens, ABB, Wallbox.
Get a quote on chargers →Verified against agency sources on 2026-05-03. Eligibility, deadlines, and dollar amounts can change between refresh cycles — always confirm directly with South Coast Air Quality Management District (SCAQMD) before applying. See how we verify.